Bronx-Whitestone Bridge / Repairs, Suspended Spans and Approaches

Miscellaneous Repairs to the Bronx-Whitestone Bridge Suspended Spans and Approaches

This project is Phase 2 of the BW-14 Project – `Miscellaneous Repairs to the Bronx-Whitestone Bridge Suspended Spans and Approaches`


Scope of Work:
  • Installation of a Median Barrier Extension System on the Main Span
  • Abatement and Painting
  • Repair and modification of an existing standpipe system
  • Replacement of Bronze Wind Pins
  • Repairs to Traveler Rail System
  • Miscellaneous repairs to the Anchorage Structures
  • Various structural steel repairs
  • Bearing replacements
  • Main cable hand rope repairs
  • Joint replacement and adjustments