NBB Deck Replacement / Bridge Deck Replacement

Newburgh – Beacon Bridge South Span Deck Replacement

This job consisted of replacing existing bridge deck with precast exothermic panels, structural steel repairs, electrical and drainage work. Kiska’s innovative approach for phasing of the project resulted in minimizing impact to traveling public, improved the quality of the design and provided cost savings to the agency. The project was completed ahead of schedule and within budget.


Scope of Work:
  • Deck Replacement
  • F&I Precast Deck Panels
  • Structural Steel Repairs
  • Drainage
  • Electrical work